Exposed trench where footing and foundation will be poured.1 / 85 Showroom will be 92 feet wide and 52 feet deep. Note new entrance to existing shop on the right.2 / 85 The first stage of the "footing" for the foundation is in progress. 3 / 85 Steel "rebar" is placed strategically into the cement for strength.4 / 85 Cement is poured to the required depth.5 / 85 Cement is poured to the required depth.6 / 85 Every corner and crevice needs to be filled. 7 / 85 Coarse grading (in the foreground) is followed by manual troweling. 8 / 85 Thousands of pounds of steel "rebar" are needed.9 / 85 Foundation almost done.10 / 85 Now, let it "set".11 / 85 Prefabricated wooden forms arrive.12 / 85 Erect the forms.13 / 85 Four-foot vertical forms in place on top of footing for foundation wall.14 / 85 Forms securely braced to withstand pressure from tons of wet cement.15 / 85 We are ready for the cement pour.16 / 85 Cement pour begins on the upright wall.17 / 85 Troweling must be done simultaneously with the pour.18 / 85 The second truck arrives with another eleven cubic yards of cement.19 / 85 The upright forms are removed exposing the finished wall.20 / 85